Renovation and redesign of a funeral hall

REFERENCES

Funeral Hall

Here, the funeral hall in Weingarten/Baden was redesigned and renovated. G140 Multifunctional PU Rapid Primer 1K was used as a moisture barrier for unheated cement screeds. D1 Speed was used as an adhesion primer – this also eliminated the need for sprinkling with quartz sand. The subfloor leveling was done M50. Our customer installed our waterproofing membrane under the tile covering. He laid the tiles with our M29 HP. After approx. 6 hours, the pavement was ready to be walked on and grouted with Multifuge Diamond MAX.